Jewson – Consett

Posted

This commercial job was conducted for Jewson’s Builders Merchant on behalf of Apollo Facility Management. The total job consisted of two areas; a triangular section at the rear service yard approximately 300m2 and the entire front end customer parking area which was 800m2. Both areas needed planed out to a depth of 40mm. The areas […]

Blue Dolphin Caravan Park- Filey

Posted

Blue Dolphin caravan park started to undergo a major development project to introduce a total number of 44 new pitching places for static caravans. This meant that 44 double and single car parking spaces outside of the pitches had to be constructed as well as 3 main access routes to the staggered levels of the […]

Clover Cottage- Catchgate

Posted

This Private driveway was a shared access route for a total number of three houses. The clients had been running on their existing base course for approximately 25 years, and thought they needed to increase the aesthetic of their location by finally topping the driveway. Our estimator, Grant, went out to site to inspect the […]

Centre Square Middlesbrough

Posted

These works on behalf of Hewitson Limited took place on Corporation Road in Middlesbrough as an emergency full construction trench reinstatement. A total of 170mm thick using 70mm AC32 Road Base, 60mm AC20 Binder course and a finishing course of 10mm SMA laid to a depth of 40mm. As it was a highway, no joints […]

Ovington Garage Car Park

Posted

Ovington Garages JEM have just completed works in Ovington for Tanfield Groundwork’s. The work’s involved planning out the area to a depth of 40mm, sweeping clear all plannings and removing them from site. We then applied k140 emulsion to the scarified area before machine laying the AC10 wearing course material. The total time spent on […]

Bellway Industrial Estate

Posted

Bellway Industrial Estate – Newcastle JEM Road construction Recently completed some minor patch and reinstatement works at bellway industrial estate in Newcastle on behalf of Woodside property services. A total of approximately 200m2 of patches that had to be prepped by planning out the areas around the potholes and broken surfaces and any manholes/tobies were […]